免费观看av_www中文字幕_国产精品tv_www.久久艹_天天操天天操_麻豆传媒在线视频_日韩avv

E-Mail: sale@zsshili.com | Hotline:0760-22601408
Home > News >>  News center
Specification for safe operation of CNC winding machine
Date:2019-12-17 08:47:37 Click:
 

In order to guide the use of the equipment to the correct operation of CNC winding machine, to prevent improper operation caused by the safety accident, so that the equipment to maintain good running state, and to develop the following rules:

One week inspection:

1, check the power supply internal connection wire is loose, wire insulation glue whether scratch or broken exposed copper core wire;

2, check whether the power supply voltage of CNC winding machine is 220V + 10V;

3, check the automatic upper and lower material cylinder SENSOR line and trachea whether or not broken or clip, indicating lamp state;

4, check the automatic upper and lower material protection cover is normal;

5, check whether the automatic upper and lower material expansion is normal;

6. Check the safety cover of the CNC winding machine to start the switch;

7, check the CNC winding machine to stop the switch function is normal, whether the emergency stop switch can be locked, indicating the state of light;

8, check the teaching box on the key functions are normal;

9, check whether the CNC winding machine tension device is normal;

10 checking whether the safety protection cover of the feeding area on the automatic feeding machine is normal.

Two, note:

1, the adjustment machine personnel must pass through the specialized training examination qualified, is familiar with the adjustment machine rule and the maintenance skill;

2, before the machine will teach the box to stop the switch to press the lock, press the rules of the machine operation;

3, hold down the button box to teach is not more than 1SEC at a time, to prevent a needle frame collision fixture;

4, fault repair must be the teaching box and the switch on the panel to stop switch on (Hong Dengliang);

Must confirm the guide needle frame at 90 degrees 5, boot before returning;

6, around the line staff must be the hair before the hair in the anti - static cap, not to reveal the forehead hair;

7, the seat on the designated line within the body, and the winding shaft distance 40cm minimum, may not be resting on the table;

8, when the winding hands to lift the work, when necessary, the hand can be placed in the middle of the material box position, hand can not be placed on the upper and lower cylinder up and down, before and after, flip the gap, to prevent the injury of the hand;

9, wear line must be a quick stop switch on the panel to open, after confirmation of the red light, it can be carried out in line operation;

10, clean the waste wire must be on the front of the emergency stop switch on the panel to confirm the red light, can be carried out;

11, automatic feeding must check whether the material feeding machine tool before operation, if there is a need to take the material before starting materials;

12, machine failure, the staff can not be allowed to handle, must be notified to the mechanic repair, and indicate the state of failure.

 

Specification for safe operation of CNC winding machine

 

Previous:Development of production technology of CNC winding machine

Next:The rational use and maintenance of CNC winding machine

主站蜘蛛池模板: 老子影院午夜伦手机不卡无 | 欧美一区二区三区综合色视频 | 欧美视频xxx | 精品视频一区在线观看 | 亚洲一级视频在线观看 | 国产美女屁股直流白浆视频无遮挡 | 午夜视频色| 日韩国产免费一区二区三区 | 色播视频网站 | 曰本亚洲欧洲色a在线 | 欧美2区| 韩国三级香港三级日本三级la | 在线观看aaa | 一二三区在线视频 | 色综合久久中文字幕网 | 亚洲综合91社区精品福利 | 欧美人人做人人爽人人喊 | 一区毛片| 青青草网址 | 狠狠干天天操 | 免费在线一区二区三区 | 波多野结衣一区在线 | a久久99精品久久久久久不 | 精品人人视屏 | 欧美国产综合视频在线观看 | 久久精品一区二区三区不卡牛牛 | 人人看97 | 亚洲一级理论片 | 99re在线视频免费观看 | 精品一区二区在线欧美日韩 | 免费一级毛片不卡不收费 | 麻豆视频传媒二区 | 依人九九 | 国产精品亚洲综合第一区 | 国产一区二区视频在线 | 在线观看亚洲免费 | 亚洲成a人片在线观看88 | 色呦呦免费 | 国产一区二区三区久久 | 久久综合色视频 | 精品久久九九 |