免费观看av_www中文字幕_国产精品tv_www.久久艹_天天操天天操_麻豆传媒在线视频_日韩avv

E-Mail: sale@zsshili.com | Hotline:0760-22601408
Home > News >>  News center
Automatic winding machine inspection before the operation
Date:2019-09-24 08:14:38 Click:
 

Frist, fully automatic winding machine, winding machine and auxiliary equipment inspection and maintenance

1. Inspection and maintenance of horizontal winding machine

1) Always check the lubrication of all moving parts, ensure good lubrication.

2) Always check all parts of fastening bolts loose to timely discovery tightened, especially tailstock foot bolts must be solid and reliable.

3) when the machine is rotated, the following operation is not allowed in the winding.

4) work, always check the disk, whether the top bend and fracture phenomena tailstock, identify problems and timely repairs.

5) when the machine is rotated, does not allow for commutation, speed shift and other operations.

2. Inspection and maintenance of vertical winding machine

1) Check the winding machine and winding butted whether faceplate bolts have been tightened, otherwise it must be re-tightened.

 2) Power Winder is damaged, such as insecurity, if it should be ruled out.

3) Check the telescopic retractable cover is good, and adjust the size of the opening and closing the distance to the faceplate or wound around the outer diameter of the winding 150ram, in order to ensure safe operation. Around

4) Check whether the strap winder or interfere with the operation of the tooling or other objects, or should be arranged in line reconnection position tray and other tooling objects.

The above content after check, can start winding machine winding operation.

SecondInspection and maintenance of winding clamping machine and the assembled rack.

1) Lift the system is working properly, if there is stuck, tilted fault stall or unsafe factors, should ask the professionals repair and eliminate insecurity.

2) the electrical part of the power and the shield is damaged, such as insecurity exists, if it should be excluded.

3) whether winding center clamping mechanism on the positive, otherwise the response is positive.

4) Whether the operator, starting compactors, the following person is not allowed to stand at compactor.

5) hydraulic compactor must check the pressure gauge is within the period of use, the reading is correct, whether hydraulic station is working properly, the hydraulic oil is adequate, or should be ruled out before use.


Automatic winding machine inspection before the operation

 

 

Previous:Lubrication Winder equipment

Next:Winder started when matters must be noted

主站蜘蛛池模板: a在线免费观看视频 | 国产在线精品一区二区高清不卡 | 日本免费高清视频二区 | 国产成人啪精品午夜在线观看 | 99精品视频在线在线视频观看 | 欧美视频一二三区 | 国产一二区视频 | 青青草99热这里都是精品 | 久久时间网 | 看a网站 | 日本我不卡| 99伊人网 | 日本高清不卡在线观看 | 九九热九九热 | 国产美女久久久久久久久久久 | 久久精品三级 | 九色九色久综色鬼在线 | 毛片福利 | 久久久久久国产精品免费免 | 午夜亚洲 | 亚洲国产精品ⅴa在线观看 亚洲国产精品成人综合色在线婷婷 | 亚洲清色| 亚洲人成在线中文字幕 | 波多野结衣手机在线视频 | 国产亚洲视频在线 | 久久精品亚洲综合 | 青春草在线观看精品免费视频 | 黄色的软件免费 | 久久国产精品99久久久久久牛牛 | 国产成人www| yiren22开心综合成人网 | 日韩免费片 | 久久受 | 热热九九 | 久久99精品国产自在现线小黄鸭 | www.不卡视频 | 久久免费区一区二区三波多野 | 欧美视频在线免费 | 韩国三级精品 | 国产成人精品系列在线观看 | 欧美日韩生活片 |