Project winding machine should be inspected before use
Date:2019-09-30 08:54:54 Click:
 

①The winding machine in the start before use, should check the nameplate, check the detailed circuit and starting equipment and other related device, each part of the circuit are properly connected, grounding is reliable, the fuse is not in good condition and in conformity with the provisions,switch, contactor is good, circuit breaker, short circuit fault,will cause damage to the motor.

②The winding machine connected to the power supply before,should check the insulation condition, if the insulation resistance is insufficient, should be dry processing, check insulation of rotor winding, calibration of carbon brush spring pressure, remove the slip rings and carbon brushes

The dirt on the surface of.

③ winding machine before use, should do first rotation direction suddenly seized load operation, inspection winding machine is correct, to change the steering, just an arbitrary two-phase wiring winding machine can be reversed. While winding machine is functioning properly observed, with or without abnormal noise or vibration, etc., to be proved after all normal, only with a load start.



Project winding machine should be inspected before use

 

Previous:Automatic coil winding machine safety regulations for technical operations

Next:Small winding motor speed slow! What is the reason?

主站蜘蛛池模板: 激情图片视频小说 | 日本三级韩国三级香港三级a级 | 国产精品日本不卡一区二区 | 精品国产91 | 狂野欧美性猛交xxxx | 亚洲国产成人九九综合 | 国产性夜夜春夜夜爽 | 亚洲www在线 | 欧美高清在线观看视频 | 免费视频不卡一区二区三区 | 欧美性xxxx极品高清3d | 久久性 | 国产亚洲一级精品久久 | 毛片一| 九九热视| 国产日本韩国不卡在线视频 | 欧美午夜精品 | 成人深爱网 | 人人看人莫人人爱免费看 | 激情视频网站 | 久色网站| 黄色午夜影院 | 理论片一级| 精品卡一卡二卡四卡三卡 | 久久99这里精品8国产 | 亚洲第一免费 | 亚洲成a人片在线观看导航 亚洲成a人片在线观看精品 | 日本黄色大片网站 | 欧美成人精品 | 人人澡澡 | 欧美一区二区三区高清不卡tv | 日本人真淫视频一区二区三区 | 视频在线观看一区 | 亚洲国产人久久久成人精品网站 | 亚洲一区二区在线视频 | 精品一区二区三区五区六区七区 | 欧美一级爱爱视频 | 久久精品亚洲一级毛片 | 国产色图片| 99精品视频在线在线视频观看 | 免费很黄很色裸乳在线观看 |